Success
Cases

Success Cases

Gas-to-Power Deployments Across Nigeria

Real project references showing Gasavant Africa’s delivery of reliable gas-powered energy systems for residential, commercial, industrial and telecom applications.

Request Consultation
Project Impact

Proven Delivery Capacity

Our installed systems demonstrate measurable capacity, fuel consumption displacement and emissions reduction across multiple locations.

5.8MW+
Total Installed Capacity
2793MT+
Annual Propane Consumption
913,000SCM+
Annual Natural Gas Consumption
638MT
Annual CO₂ Emission Reduction
Nationwide Footprint

Site Locations Across Nigeria

Gasavant Africa’s genset and gas infrastructure deployments span multiple states, supporting critical power needs across the country.

Gasavant genset site locations across Nigeria
Reference Projects

Selected Success Cases

Each deployment reflects Gasavant Africa’s ability to combine gas supply, storage, generator systems and installation support into practical energy solutions.

ASATO Hotel genset ASATO Hotel tank storage

ASATO Hotel

Asaba, Delta | April 2025

200 kVA and 80 kVA generator systems with 7 MT LPG storage tank.

Grade 1 genset and storage tank

Grade 1

Lagos | July 2025

30 kVA generator with 800 kg propane vertical tank.

Nirmax tank Nirmax genset

Nimarx Agro Industries

Anambra | June 2025

250 kVA generator with 5 MT propane vertical tank.

IHS telecom site CNG deployment

IHS Transmitter Station

Ogun | March 2025

25 kVA generator with 500 SCM x 2 CNG storage cascade.

IOGC genset IOGC piping installation

IOGC Facility

Nigeria

100 kVA generator delivery with piping installation.

Kado Estate genset

Kado Estate

Abuja | December 2025

350 kVA and 150 kVA generator systems with 8.5 MT propane tank.

MOB mini depot gas storage MOB mini depot genset

MOB Integrated Mini Depot

Niger | August 2023

300 kVA and 100 kVA propane generators with 2.5 MT horizontal tank.

Hope Alive genset

Hope Alive Water Factory

Abuja | November 2024

200 kVA generator with 7.5 MT propane vertical tank and spare parts support.

Project Completed

MocX

Abule Egba, Lagos | February 2026

300 kVA generator with 5 MT propane horizontal tank.

Project Completed

Jabi Project

Abuja | February 2026

100 kVA generator with 3.5 MT propane vertical tank.

Project Completed

Dutse Project

Jigawa | January 2026

125 kVA generator with 3.5 MT propane vertical tank.

Project Completed

Ota Project

Ogun | January 2026

300 kVA generator with 5 MT propane horizontal tank.

Project Completed

81 Units Apartment Project

Lekki, Lagos | August 2025

300 kVA and 200 kVA generators with 2 MT x 2 propane vertical tanks.

Project Completed

Pipeline Gas Project

Belema, Rivers | July 2025

1000 kVA system with 2,300 SCM daily pipeline gas and PRMS.

Project Completed

Kano Project

Kano | June 2025

125 kVA generator with 10 MT propane horizontal tank.

Project Completed

Pealon Hospital

Victoria Island, Lagos | July 2019

160 kW x 2 generator sets with 2 MT x 2 underground propane tanks.

Why Gasavant

Built for Reliable Project Delivery

Gasavant Africa combines gas infrastructure knowledge, technical partnerships and field execution experience to deliver practical energy solutions.

Engineering Focus

Solutions are designed around site requirements, operating profile, storage needs and long-term reliability.

End-to-End Execution

From supply and storage to generator integration and installation support, Gasavant coordinates complete delivery.

Cost Efficiency

Gas-to-power systems help reduce dependence on diesel and support lower operating costs over time.

Ready to Reduce Your Energy Costs?

Speak with Gasavant Africa about gas-to-power options for your facility, estate, factory, telecom site or industrial operation.

Request Consultation
Our Company